Al Mubarak Transport

Blueline Metro Project

Project Name: Blueline Metro Project
Client: RTA
Main Contractor: MLCC JV
Scope:
1. Earthworks for 5.5M m3 inclduing sand shifting withing stations and disposal in DM Depot

Project Details

About the Project

Executed large-scale earthmoving and bulk material management for the Roads and Transport Authority (RTA) and MLCC JV on the landmark Blue Line Metro development. The project required continuous logistics coordination to shift massive volumes of sand across station sites and haul excess material to designated Dubai Municipality depots.

Execution of 5.5 million m³ of mass earthworks across multiple metro station zones

Precision sand shifting and site leveling within active infrastructure corridors

Large-scale material haulage and certified disposal to the DM Depot

High-capacity fleet deployment complying with strict municipality and transport authority standards