Al Mubarak Transport

Island Park 1 and 2, Plot A026 and A027

Project Name: Island Park 1 and 2, Plot A026 and A027
Client: Emaar
Main Contractor: Fibrex Contracting LLC
Scope: Excavation and sand shifting of high rise tower incl. basements – 1.2 Million m3

Project Details

About the Project

Delivered deep site excavation and large-scale material handling for Emaar and Fibrex Contracting LLC on the Island Park 1 and 2 high-rise developments. Operating in a tight urban footprint, our team safely excavated and mobilized vast volumes of sand to establish foundation levels for the multi-level basement structures.

Execution of 1.2 million m³ of deep basement excavation and sand shifting

Precision earthmoving to support foundation readiness for high-rise residential towers

Efficient site logistics and high-volume material transport from congested plots

Strict adherence to structural safety and ground stabilization protocols