Al Mubarak Transport

Ketura Resort Development

Project Name: Ketura Resort Development
Client: MAG Group Holding
Main Contractor: CECEP
Scope:
1. Earthworks incldudint excavation and backfill of imported fill for 1.8M m3
2. Demolition and disposal of shoring walls and utility dusts
3. Gravel supply, filling and compaction below raft foundations

Project Details

About the Project

Delivered comprehensive site preparation, mass earthworks, and foundation fill operations for MAG Group Holding and CECEP on the luxury Keturah Resort Development. The scope combined large-scale earthmoving with specialized demolition and engineered gravel filling to establish solid ground conditions prior to main raft foundation casting.

1.8 million m³ of bulk excavation and backfilling using imported fill materials

Controlled demolition and off-site disposal of existing shoring walls and utility ducts

Supply, placement, and high-density compaction of gravel sub-layers beneath raft foundations

Seamless site clearance and ground engineering tailored for high-end resort infrastructure