Palm Jabel Ali Development

Project Name: Palm Jabel Ali Development
Client: Dubai Holding
Main Contractor: Keller Grundbau GmbH
Scope:
1. Earthworks with cut and fill for 2.5 million cubic meter sand for 8 Fronds, Spines and Trucks
2. Surface compaction for 2 Million m2 achieving 95% MDD
Record breaking production of cutt and fill and compaction of 8 Fronds (A-G, H, I) in only 45 days using 500 dump trucks and 150 equipment

Project Details

About the Project

Delivered high-volume earthworks and large-scale surface compaction for Dubai Holding and Keller Grundbau GmbH on the iconic Palm Jebel Ali development. Mobilizing an unprecedented fleet of 500 dump trucks and 150 heavy machines, our teams achieved record-breaking production rates to complete full site preparation across 8 Fronds, Spines, and Trunks in just 45 days.

Mass excavation and placement of 2.5 million m3 and m2 of sand fill across 8 Fronds (A–G, H, I)

High-density surface compaction spanning 2 million $m^2$ to achieve 95% MDD

Rapid mobilization and operational coordination of 650+ active fleet units

Record completion time of 45 days while maintaining strict engineering standards